FOHP sent this report to BCP Council in October 2019 after a visual inspection of the pool. It was used, along with the Council’s own defect list, to inform the contractor on what remedial work needed doing.
FOHP sent this report to BCP Council in October 2019 after a visual inspection of the pool. It was used, along with the Council’s own defect list, to inform the contractor on what remedial work needed doing.